The Spanish Electricity System. Preliminary report 2015
This preliminary report presents provisional statistical data regarding the behaviour of the Spanish electricity system in 2015.
The Spanish Electricity System. Preliminary report 2015
Informes
The Spanish Electricity System. Preliminary report 2015
Power Stations - Location. Preliminary report 2015: Provisional data
Transmission grid. Installations programmed, under construction or in service as at 31 December 2015

Summary:

  • Electricity balance, installed power capacity and transmission grid
  • Peninsular system
  • Non-peninsular systems
  • Terminology index